Skip to Content

In this Weekly Dispatch:

  1. VNI West has been delayed: it is now expected to not be completed until late 2030.
  2. The CQH2 hydrogen project is no longer proceeding after losing the support of Stanwell.
  3. NSW Parliament’s “Infrastructure for electric and alternative energy source vehicles in NSW” inquiry gets underway.
  4. AGL takes over Tesla’s South Australia virtual power plant.
  5. A heat wave in Europe sees some nuclear plants turned off due to cooling water temperatures being too high.
  6. An east coast low battered eastern Australia, at one point cutting power to 35,000 Ausgrid customers.
  7. Podcast of the week: the Bloomberg Switched ON podcast discuss drivers in global EV production and uptake.

Contact

a. A
Level 31, 9 Castlereagh St, Sydney NSW 2000
a.
Level 31, 9 Castlereagh St, Sydney NSW 2000

Oops! We could not locate your form.

Get in touch.