{"id":1878,"date":"2026-10-23T13:57:27","date_gmt":"2026-10-23T02:57:27","guid":{"rendered":"https:\/\/www.endgameanalytics.com.au\/?p=1878"},"modified":"2026-10-23T13:57:28","modified_gmt":"2026-10-23T02:57:28","slug":"yoo-hoo-big-snowy-blowout","status":"publish","type":"post","link":"https:\/\/www.endgameanalytics.com.au\/ja\/yoo-hoo-big-snowy-blowout\/","title":{"rendered":"Yoo-hoo! Big Snowy blowout!"},"content":{"rendered":"<h3 class=\"wp-block-heading\">Highlights from the Australian market<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Snowy 2.0\u2019s price tag has <a href=\"https:\/\/www.abc.net.au\/news\/2026-10-22\/cost-of-snowy-hydro-expansion-doubles\/107276162\">blown out to up to $25 billion<\/a>, another increase from the original $2 billion when it was announced in 2017. With tunnelling only 65% complete, the 2,200 MW pumped hydro project isn\u2019t expected to deliver first power until early 2029.<\/li>\n\n\n\n<li>Alinta Energy has <a href=\"https:\/\/www.abc.net.au\/news\/2026-10-22\/oven-mountain-pumped-hydro-scheme-abandoned\/107295182\">abandoned its $1.8 billion, 900 MW Oven Mountain pumped hydro scheme<\/a> in northern NSW, citing economic and timing challenges including a critical transmission line. It\u2019s the second largest NSW project scrapped this month, after Origin\u2019s Skye Ridge Wind Farm, as falling battery costs undercut pumped hydro.<\/li>\n\n\n\n<li>WEM news: AEMO has set the 2028-29 <a href=\"https:\/\/www.aemo.com.au\/energy-systems\/electricity\/wholesale-electricity-market-wem\/wa-reserve-capacity-mechanism\/reserve-capacity-price\">Reserve Capacity Prices<\/a> at $459,192\/MW\/year for Peak capacity and $244,250\/MW\/year for Flexible capacity, alongside the <a href=\"https:\/\/www.aemo.com.au\/energy-systems\/electricity\/wholesale-electricity-market-wem\/wa-reserve-capacity-mechanism\/assignment-of-capacity-credits\">assignment of capacity credits<\/a> for the 2026 Reserve Capacity Cycle.<\/li>\n\n\n\n<li><a href=\"https:\/\/www.abc.net.au\/news\/2026-10-23\/nextdc-downgrade-sees-people-power-hit-for-multi-billion-firm\/107293706\">NextDC expects its future earnings to fall by about a third<\/a> after West Footscray residents stalled Jemena\u2019s rollout of 15-metre, 66 kV power poles to its Melbourne M3 data centre by parking their cars in the street to block the work trucks. Morningstar expects community pushback like this to drive new data centres further from built-up areas.<\/li>\n\n\n\n<li>A new alliance of Queensland community groups, backed by Nationals leader David Littleproud, is <a href=\"https:\/\/www.abc.net.au\/news\/2026-10-20\/regional-voices-queensland-calls-for-landholder-protection\/107289452\">calling for tougher rules on wind and solar developments<\/a>, including minimum 3 km setbacks from homes and up-front decommissioning bonds. It follows growing frustration among neighbours of projects, such as Stanwell\u2019s Wambo Wind Farm, and adds to planning risk for the Queensland renewables pipeline.<\/li>\n\n\n\n<li>NSW spot prices hit $23,107\/MWh on 12 October when a spring heatwave coincided with coal outages. Amber Electric\u2019s roughly 30,000 customers <a href=\"https:\/\/www.abc.net.au\/news\/2026-10-17\/home-batteries-make-money-in-nsw-power-price-spike\/107260880\">earned about $2 million in two hours by exporting from home batteries<\/a> during the spike, which raises questions about AEMO\u2019s lack of visibility over behind-the-meter storage.<\/li>\n\n\n\n<li>Paywalled: LNG importers across Asia are pushing back on the federal government\u2019s plan to make exporters reserve gas for the domestic market, <a href=\"https:\/\/www.smh.com.au\/business\/companies\/australia-clashes-with-asian-energy-giants-over-gas-export-crackdown-20261019-p61685.html\">putting Australia at odds with the region\u2019s major energy buyers<\/a>. The outcome will shape east coast gas supply and prices for gas-fired generation.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">News from Japan<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Paywalled: <a href=\"https:\/\/www.nikkei.com\/article\/DGXZQOUA153AK0V11C26A0000000\/\">METI is considering raising the fee for grid connection applications<\/a>, which hasn\u2019t changed since 2012 (\u00a5220,000, about AUD 2,000), to stop BESS developers from holding grid capacity without firm plans. Applications have jumped from 1,599 in FY2023 to nearly 25,000 in FY2025, and earlier measures like a higher deposit and caps on applications per developer haven\u2019t slowed them.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Podcast of the week<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">BloombergNEF\u2019s Switched On looks at <a href=\"https:\/\/open.spotify.com\/episode\/3Ml0ZpVw5Y9mA3yyutJ06l?si=25a5511be01a4ecd\">why gas turbine makers are cashing in on the global power rush<\/a>. With orders surging, delivery slots scarce and data centres driving demand, they ask how long the boom can last and whether manufacturers can expand without repeating past overcapacity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>Highlights from the Australian market News from Japan Podcast of the week BloombergNEF\u2019s Switched On looks at why gas turbine makers are cashing in on the global power rush. With orders surging, delivery slots scarce and data centres driving demand, they ask how long the boom can last and whether manufacturers can expand without repeating past overcapacity.<\/p>","protected":false},"author":19,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","footnotes":""},"categories":[9,7],"tags":[44,32,27,33,31,45,28,38,46],"topic":[],"industry":[20],"class_list":["post-1878","post","type-post","status-publish","format-standard","hentry","category-news","category-the-weekly-dispatch","tag-australia","tag-electricity","tag-energy","tag-modelling","tag-nem","tag-news","tag-prices","tag-system","tag-updates","industry-energy"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.2.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Highlights from the Australian market Snowy 2.0\u2019s price tag has blown out to up to $25 billion, another increase from the original $2 billion when it was announced in 2017. With tunnelling only 65% complete, the 2,200 MW pumped hydro project isn\u2019t expected to deliver first power until early 2029. Alinta Energy has abandoned its\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Jade Lee\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.endgameanalytics.com.au\/ja\/yoo-hoo-big-snowy-blowout\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.2.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"ja_JP\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Endgame Analytics -\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Yoo-hoo! Big Snowy blowout! - Endgame Analytics\" \/>\n\t\t<meta property=\"og:description\" content=\"Highlights from the Australian market Snowy 2.0\u2019s price tag has blown out to up to $25 billion, another increase from the original $2 billion when it was announced in 2017. With tunnelling only 65% complete, the 2,200 MW pumped hydro project isn\u2019t expected to deliver first power until early 2029. Alinta Energy has abandoned its\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.endgameanalytics.com.au\/ja\/yoo-hoo-big-snowy-blowout\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-10-23T02:57:27+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-10-23T02:57:28+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Yoo-hoo! Big Snowy blowout! - Endgame Analytics\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Highlights from the Australian market Snowy 2.0\u2019s price tag has blown out to up to $25 billion, another increase from the original $2 billion when it was announced in 2017. With tunnelling only 65% complete, the 2,200 MW pumped hydro project isn\u2019t expected to deliver first power until early 2029. Alinta Energy has abandoned its\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/yoo-hoo-big-snowy-blowout\\\/#blogposting\",\"name\":\"Yoo-hoo! Big Snowy blowout! - Endgame Analytics\",\"headline\":\"Yoo-hoo! Big Snowy blowout!\",\"author\":{\"@id\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/author\\\/jade-lee\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/#organization\"},\"datePublished\":\"2026-10-23T13:57:27+11:00\",\"dateModified\":\"2026-10-23T13:57:28+11:00\",\"inLanguage\":\"ja\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/yoo-hoo-big-snowy-blowout\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/yoo-hoo-big-snowy-blowout\\\/#webpage\"},\"articleSection\":\"NEWS &amp; UPDATES, THE WEEKLY DISPATCH, australia, electricity, energy, modelling, NEM, news, prices, system, updates, Energy\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/yoo-hoo-big-snowy-blowout\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/category\\\/the-weekly-dispatch\\\/#listItem\",\"name\":\"THE WEEKLY DISPATCH\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/category\\\/the-weekly-dispatch\\\/#listItem\",\"position\":2,\"name\":\"THE WEEKLY DISPATCH\",\"item\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/category\\\/the-weekly-dispatch\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/yoo-hoo-big-snowy-blowout\\\/#listItem\",\"name\":\"Yoo-hoo! Big Snowy blowout!\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/yoo-hoo-big-snowy-blowout\\\/#listItem\",\"position\":3,\"name\":\"Yoo-hoo! Big Snowy blowout!\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/category\\\/the-weekly-dispatch\\\/#listItem\",\"name\":\"THE WEEKLY DISPATCH\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/#organization\",\"name\":\"Endgame Analytics\",\"url\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/author\\\/jade-lee\\\/#author\",\"url\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/author\\\/jade-lee\\\/\",\"name\":\"Jade Lee\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/yoo-hoo-big-snowy-blowout\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/eb96b4526443aed9aa22f346cb6ccedd6d3d00a94afc4236852d9f22cade1548?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Jade Lee\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/yoo-hoo-big-snowy-blowout\\\/#webpage\",\"url\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/yoo-hoo-big-snowy-blowout\\\/\",\"name\":\"Yoo-hoo! Big Snowy blowout! - Endgame Analytics\",\"description\":\"Highlights from the Australian market Snowy 2.0\\u2019s price tag has blown out to up to $25 billion, another increase from the original $2 billion when it was announced in 2017. With tunnelling only 65% complete, the 2,200 MW pumped hydro project isn\\u2019t expected to deliver first power until early 2029. Alinta Energy has abandoned its\",\"inLanguage\":\"ja\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/yoo-hoo-big-snowy-blowout\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/author\\\/jade-lee\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/author\\\/jade-lee\\\/#author\"},\"datePublished\":\"2026-10-23T13:57:27+11:00\",\"dateModified\":\"2026-10-23T13:57:28+11:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/#website\",\"url\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/\",\"name\":\"Endgame Analytics\",\"inLanguage\":\"ja\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.endgameanalytics.com.au\\\/ja\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Yoo-hoo! Big Snowy blowout! - Endgame Analytics","description":"Highlights from the Australian market Snowy 2.0\u2019s price tag has blown out to up to $25 billion, another increase from the original $2 billion when it was announced in 2017. With tunnelling only 65% complete, the 2,200 MW pumped hydro project isn\u2019t expected to deliver first power until early 2029. Alinta Energy has abandoned its","canonical_url":"https:\/\/www.endgameanalytics.com.au\/ja\/yoo-hoo-big-snowy-blowout\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.endgameanalytics.com.au\/ja\/yoo-hoo-big-snowy-blowout\/#blogposting","name":"Yoo-hoo! Big Snowy blowout! - Endgame Analytics","headline":"Yoo-hoo! Big Snowy blowout!","author":{"@id":"https:\/\/www.endgameanalytics.com.au\/ja\/author\/jade-lee\/#author"},"publisher":{"@id":"https:\/\/www.endgameanalytics.com.au\/ja\/#organization"},"datePublished":"2026-10-23T13:57:27+11:00","dateModified":"2026-10-23T13:57:28+11:00","inLanguage":"ja","mainEntityOfPage":{"@id":"https:\/\/www.endgameanalytics.com.au\/ja\/yoo-hoo-big-snowy-blowout\/#webpage"},"isPartOf":{"@id":"https:\/\/www.endgameanalytics.com.au\/ja\/yoo-hoo-big-snowy-blowout\/#webpage"},"articleSection":"NEWS &amp; UPDATES, THE WEEKLY DISPATCH, australia, electricity, energy, modelling, NEM, news, prices, system, updates, Energy"},{"@type":"BreadcrumbList","@id":"https:\/\/www.endgameanalytics.com.au\/ja\/yoo-hoo-big-snowy-blowout\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.endgameanalytics.com.au\/ja\/#listItem","position":1,"name":"Home","item":"https:\/\/www.endgameanalytics.com.au\/ja\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.endgameanalytics.com.au\/ja\/category\/the-weekly-dispatch\/#listItem","name":"THE WEEKLY DISPATCH"}},{"@type":"ListItem","@id":"https:\/\/www.endgameanalytics.com.au\/ja\/category\/the-weekly-dispatch\/#listItem","position":2,"name":"THE WEEKLY DISPATCH","item":"https:\/\/www.endgameanalytics.com.au\/ja\/category\/the-weekly-dispatch\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.endgameanalytics.com.au\/ja\/yoo-hoo-big-snowy-blowout\/#listItem","name":"Yoo-hoo! Big Snowy blowout!"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.endgameanalytics.com.au\/ja\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.endgameanalytics.com.au\/ja\/yoo-hoo-big-snowy-blowout\/#listItem","position":3,"name":"Yoo-hoo! Big Snowy blowout!","previousItem":{"@type":"ListItem","@id":"https:\/\/www.endgameanalytics.com.au\/ja\/category\/the-weekly-dispatch\/#listItem","name":"THE WEEKLY DISPATCH"}}]},{"@type":"Organization","@id":"https:\/\/www.endgameanalytics.com.au\/ja\/#organization","name":"Endgame Analytics","url":"https:\/\/www.endgameanalytics.com.au\/ja\/"},{"@type":"Person","@id":"https:\/\/www.endgameanalytics.com.au\/ja\/author\/jade-lee\/#author","url":"https:\/\/www.endgameanalytics.com.au\/ja\/author\/jade-lee\/","name":"Jade Lee","image":{"@type":"ImageObject","@id":"https:\/\/www.endgameanalytics.com.au\/ja\/yoo-hoo-big-snowy-blowout\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/eb96b4526443aed9aa22f346cb6ccedd6d3d00a94afc4236852d9f22cade1548?s=96&d=mm&r=g","width":96,"height":96,"caption":"Jade Lee"}},{"@type":"WebPage","@id":"https:\/\/www.endgameanalytics.com.au\/ja\/yoo-hoo-big-snowy-blowout\/#webpage","url":"https:\/\/www.endgameanalytics.com.au\/ja\/yoo-hoo-big-snowy-blowout\/","name":"Yoo-hoo! Big Snowy blowout! - Endgame Analytics","description":"Highlights from the Australian market Snowy 2.0\u2019s price tag has blown out to up to $25 billion, another increase from the original $2 billion when it was announced in 2017. With tunnelling only 65% complete, the 2,200 MW pumped hydro project isn\u2019t expected to deliver first power until early 2029. Alinta Energy has abandoned its","inLanguage":"ja","isPartOf":{"@id":"https:\/\/www.endgameanalytics.com.au\/ja\/#website"},"breadcrumb":{"@id":"https:\/\/www.endgameanalytics.com.au\/ja\/yoo-hoo-big-snowy-blowout\/#breadcrumblist"},"author":{"@id":"https:\/\/www.endgameanalytics.com.au\/ja\/author\/jade-lee\/#author"},"creator":{"@id":"https:\/\/www.endgameanalytics.com.au\/ja\/author\/jade-lee\/#author"},"datePublished":"2026-10-23T13:57:27+11:00","dateModified":"2026-10-23T13:57:28+11:00"},{"@type":"WebSite","@id":"https:\/\/www.endgameanalytics.com.au\/ja\/#website","url":"https:\/\/www.endgameanalytics.com.au\/ja\/","name":"Endgame Analytics","inLanguage":"ja","publisher":{"@id":"https:\/\/www.endgameanalytics.com.au\/ja\/#organization"}}]},"og:locale":"ja_JP","og:site_name":"Endgame Analytics -","og:type":"article","og:title":"Yoo-hoo! Big Snowy blowout! - Endgame Analytics","og:description":"Highlights from the Australian market Snowy 2.0\u2019s price tag has blown out to up to $25 billion, another increase from the original $2 billion when it was announced in 2017. With tunnelling only 65% complete, the 2,200 MW pumped hydro project isn\u2019t expected to deliver first power until early 2029. Alinta Energy has abandoned its","og:url":"https:\/\/www.endgameanalytics.com.au\/ja\/yoo-hoo-big-snowy-blowout\/","article:published_time":"2026-10-23T02:57:27+00:00","article:modified_time":"2026-10-23T02:57:28+00:00","twitter:card":"summary_large_image","twitter:title":"Yoo-hoo! Big Snowy blowout! - Endgame Analytics","twitter:description":"Highlights from the Australian market Snowy 2.0\u2019s price tag has blown out to up to $25 billion, another increase from the original $2 billion when it was announced in 2017. With tunnelling only 65% complete, the 2,200 MW pumped hydro project isn\u2019t expected to deliver first power until early 2029. Alinta Energy has abandoned its"},"aioseo_meta_data":{"post_id":"1878","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-10-23 00:57:31","updated":"2026-10-23 03:50:55","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.endgameanalytics.com.au\/ja\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.endgameanalytics.com.au\/ja\/category\/the-weekly-dispatch\/\" title=\"THE WEEKLY DISPATCH\">THE WEEKLY DISPATCH<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tYoo-hoo! Big Snowy blowout!\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.endgameanalytics.com.au\/ja\/"},{"label":"THE WEEKLY DISPATCH","link":"https:\/\/www.endgameanalytics.com.au\/ja\/category\/the-weekly-dispatch\/"},{"label":"Yoo-hoo! Big Snowy blowout!","link":"https:\/\/www.endgameanalytics.com.au\/ja\/yoo-hoo-big-snowy-blowout\/"}],"featured_image_src":null,"featured_image_src_square":null,"author_info":{"display_name":"Jade Lee","author_link":"https:\/\/www.endgameanalytics.com.au\/ja\/author\/jade-lee\/"},"_links":{"self":[{"href":"https:\/\/www.endgameanalytics.com.au\/ja\/wp-json\/wp\/v2\/posts\/1878","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.endgameanalytics.com.au\/ja\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.endgameanalytics.com.au\/ja\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.endgameanalytics.com.au\/ja\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.endgameanalytics.com.au\/ja\/wp-json\/wp\/v2\/comments?post=1878"}],"version-history":[{"count":1,"href":"https:\/\/www.endgameanalytics.com.au\/ja\/wp-json\/wp\/v2\/posts\/1878\/revisions"}],"predecessor-version":[{"id":1879,"href":"https:\/\/www.endgameanalytics.com.au\/ja\/wp-json\/wp\/v2\/posts\/1878\/revisions\/1879"}],"wp:attachment":[{"href":"https:\/\/www.endgameanalytics.com.au\/ja\/wp-json\/wp\/v2\/media?parent=1878"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.endgameanalytics.com.au\/ja\/wp-json\/wp\/v2\/categories?post=1878"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.endgameanalytics.com.au\/ja\/wp-json\/wp\/v2\/tags?post=1878"},{"taxonomy":"topic","embeddable":true,"href":"https:\/\/www.endgameanalytics.com.au\/ja\/wp-json\/wp\/v2\/topic?post=1878"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/www.endgameanalytics.com.au\/ja\/wp-json\/wp\/v2\/industry?post=1878"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}